This general labor position involves preparation of the unit for the paint process; power washing, scraping, sanding, and material handling. The ability to use basic hand tools is required, with occasional forklift operation. SHIFT WORK SCHEDULES (Unless otherwise noted.)1st shift runs M–Th, 5:00 AM – 3:00 PM, 2nd shift runs M–Th, 3:30 PM – 1:30 AM